Walkways were required to be constructed throughout the ceiling space to enable the servicing of existing Air conditioning and installation of new air conditioning systems to the concert hall. The hall was used throughout the works.
The ceiling was not to be damaged in any way as painting is a major issue due to height above the floor & the colours are numerous, the original light fittings had to be built around & right up too, so this posed issues that required care & proper procedures need to be put in place.
Access was also an issue so most items where craned onto the roof with an opening made in the slate roofing & alterations to the framing made, then all materials made good on completion.